Two upgrades
Added E Track along walls to accommodate our specific weight balance needs.
Sure is hard to drill the first holes! E Track is fastened with SS to frame and backed up under the wood portions with 1/8 x 2 steel.
No Insulation here - it will B4 reinstallation.
Pump Station Timer Armor -from factory this is just hanging in the spray zone of the curbside wheels. In our wet conditions this won't last thru the winter.....
In Process
Finished with wiring armor installed -factory uses very little armor to protect wire running along frame under trailer -many more projects to come to fix this.
I'm cornfused... what the heck is the e-track for?
Ryan and Persephone (Seph)+ a boy (7) and girl (5)
2005 Cummins Quad Cab 2wd
2008 Terry 295BHDS
Prodigy Brake Controller
Pullrite Superglide
Dual Honda EU2000i's