RET ARMY 1980, DW Donna , "Tiny" (furkid) . Class A, 2007 Bounder 35E, Ford Chassis, 4 SAMS 6VOLTS,405W Solar,TriStar 45 Controller,1750W INVERTER, YAMAHA 2400, TOW: Honda CRV. READY BRAKE. "Living Our Dream". NASCAR FAN 14,18,20,11 LOVE CO & NM
Construction
US0087
Northbound and Southbound
2009-11-02 8:00 AM to 2012-05-31 5:00 PM
FM 2589 to US 87/287/SH 152
Description: Multiple lane closures.
Motorists should expect delays.
10' oversized load restriction from JCT US 87/287 to FM 2589. Traffic reduced from 2 lanes each direction to 1 lane each direction from US 287/SH 152 intersection to West of Railroad tracks. (Delay)
We are traveling that way this summer but we will travel west on IH 40 West of Amarillo and take Highway 385 north and hope to bypass the construction (Read that hint here on the forum)
Marilyn w/ Joe, 2000 Xplorer Class B van, usually pulling a Ranger bass boat.
Smudge, (in photo) a Shih Tzu/Yorkie Mix and Gizmo is waiting at the Rainbow Bridge
Are you refering to US 287 north from Dumas to I-25 in Denver?
I think GizmosMom refers to the route of US 385 to get you to US 87 at Hartley to I-25 in Raton.
* This post was
edited 04/30/11 01:15pm by BB_TX *